$ catalog --items 251404 --sellers 7532 --status ok
Проект ввода ВОК на компрессорную станцию
#4628995

Проект ввода ВОК на компрессорную станцию

This section of the project provides for the input of the main cable to the compressor station in the communication node from the unattended intermediate point (UIP), with the installation of cable of the OKLK-01-6-8-10/125-0.36/0.22-3.5/18-(7) brand.
The installation of the fiber-optic cable in the ground is carried out manually in an open trench, to a depth of at least 1.2 m, the excavation of the trench is provided using an excavator and manually.
The installation of the fiber-optic cable across the territory is provided for in a separate channel of the designed telephone duct.
The project for the input of the fiber-optic communication line to the territory of the enterprise contains the following drawings:
- general data;
- explanatory note;
- scheme for the input of the fiber-optic communication line to the enterprise;
- structural scheme for the installation of the main fiber-optic communication line;
- grounding of the OKLK cable;
- specification of equipment, products and materials.

File format: dwg, tif (AutoCAD 2010 not editable)
Note: source files of *.tif format must be in the same folder with the project file *.dwg

Оплата и выдача товара осуществляются через партнёрскую платформу.

Отзывы

Пока нет отзывов на этот товар.

Похожие товары

Изображения и наименования товаров могут содержать товарные знаки правообладателей и приведены исключительно в информационных целях; сайт не аффилирован с правообладателями.